Sourcing Lab / Wheel-end fitment

NTN SNR Sourcing Lab

A cross reference identifies a candidate. Compare its drawing revision, ABS encoder, service scope and receiving-market evidence before treating two offers as equivalents.

Review the evidence matrix
Verification worksheet

Six checks on a matched reference

Example review sequence for a front wheel bearing. Values and limits come from the buyer’s application and the selected supplier’s agreed drawing.

01 / Supplier record

Identity and revision

Compare the OE cross reference, build range, axle and side. Two offers can share a cross reference while describing different hardware or ABS encoder ring revisions. Request the supersession chain and list the exact SKU and drawing revision on the quote.

02 / Sample check

Envelope and seating

Record bore, OD and width in mm against the drawing. An illustrative 42 × 80 × 36 mm envelope still leaves the bearing preload, seal lip and encoder requirements open. For hub flange runout, seat the sample on the agreed datum, zero the indicator at the specified track and record the full-revolution max-minus-min reading in mm. Log the mounting condition, gauge resolution and applicable drawing limit.

03 / Document scope

System and product files

For a system certificate, verify the site, scope and validity. For SKU-level evidence, match the report reference, sample, test method, conditions and receiving-market requirement.

04 / Third party

Encoder and seal

Agree the inspection method for ABS encoder ring side, pole count and wheel speed sensor interface where specified. Confirm the seal lip orientation and drawing revision before any comparison.

05 / Buyer approval

Integrated or serviceable

Compare included hardware, setup work and spares stocking. An integrated hub may reduce press work. A separate bearing can preserve the flange where the vehicle service procedure allows it.

06 / Supplier and forwarder

Shipment baseline

Normalize quote quantity, currency, Incoterm and named place. A single supplier simplifies evidence handoff. A split award can cover additional references and needs lot-to-carton mapping for mixed-container loading.

Sourcing sequence

From brief to shipment

01

Clarify

Identify the vehicle, target market and unresolved fitment fields.

02

Compare

Line up offers by configuration, hardware and trade terms.

03

Verify

Match the sample and inspection scope to the quoted SKU.

04

Coordinate

Record the buyer’s decision and reconcile the shipment documents.

Send a wheel procurement RFQ