Wheel-end procurement / China

NTN SNR wheel bearing sourcing

NTN SNR is an independent China sourcing service for buyers comparing wheel bearings, kits and hub assemblies.

Wheel bearing and hub components arranged for a catalog review 01 / Catalog

Browse product lines

Start with the part architecture and carry its OE reference into your inquiry.

Open catalog
Sourcing worksheet beside a sealed bearing sample 02 / RFQ

Submit a sourcing brief

Send the vehicle platform, axle position, quantity and destination in one request.

Start an RFQ
Part families

Four ways to define the part

Sealed double-row wheel bearing

Press-in wheel bearing

Bore / OD / width

Tapered wheel bearing cone and cup

Tapered bearing set

Cone / cup pairing

Wheel bearing service kit with circlip and nut

Bearing service kit

Hardware scope

Flanged hub assembly with a wheel speed sensor lead

Integrated hub unit

Flange / encoder

Fitment inputs

What belongs on an RFQ line

Identity and geometry

Vehicle record
Send the OE cross reference, VIN or exact platform and build date, axle position and left/right side. If the vehicle record and sample disagree, flag the conflict for review.
Physical envelope
For a bearing, list bore, outer diameter and width in mm. For an assembly, add hub flange, pilot and mounting dimensions from a drawing.

Signal and service scope

ABS interface
Record the ABS encoder ring type and orientation. If the assembly includes a wheel speed sensor, identify its connector and cable routing.
Kit contents
Separate the double-row angular contact bearing, seal lip orientation, snap ring and axle nut into line items. Call out the bearing preload requirements from the vehicle service data where relevant.
Decision sequence

From cross reference to release

  1. 01

    Clean the list

    Split references by axle and flag supersessions for confirmation.

  2. 02

    Normalize quotes

    Align kit contents, trade terms, packaging and exclusions.

  3. 03

    Check a sample

    Match its label and drawing revision to the quoted line.

  4. 04

    Agree release

    Record buyer approval, carton marks and document owners.

Who uses the brief

Built around the buyer’s job

Aftermarket importers

Match references before adding a line.

Parts distributors

Specify kit contents and carton labels.

Fleet buyers

Group requests by platform and axle.

Repair networks

Separate press-in kits from hub units.

Catalog teams

Record fitment exceptions before publication.

Supplier quality

Agree sample checks before release.

Evidence matrix

Evidence before commitment

Supplier

Supplier records

Match the quoted company, manufacturing site and part number to the drawing and commercial offer.

Buyer

Sample check

Check bore, outside diameter and width against the agreed drawing. An illustrative 42 × 80 × 36 mm dimension record identifies only the envelope. Record the sample code, ABS encoder ring orientation and seal lip geometry separately.

Supplier / issuer

Document scope

Separate a quality-system certificate’s site and scope from evidence covering a particular SKU and market.

Third party

Inspection brief

Define the lot, sample plan and reporting method. If the hub flange drawing specifies axial face runout, agree its datum and fixture separately from any radial runout check. Carry the supplier drawing’s limits into the inspection brief.

Buyer

Release decision

Record whether the sample is approved, conditionally approved or held for unresolved differences.

Supplier / forwarder

Shipment checklist

Reconcile part numbers, carton counts and shipping marks against the packing list before handoff.

Buyer questions

Before you send the list

Is an OE reference enough to confirm fitment?

It starts the search. A supersession or production split can change the seal or encoder. Include the VIN or exact platform and build date, axle position, old-part markings and drawing if available.

When should a quote separate bearing and hub options?

Quote them separately when the platform supports both service scopes. A complete unit may reduce press and setup work. A serviceable bearing may retain reusable hardware, subject to the vehicle service procedure.

How are minimums and lead times confirmed?

Request them per supplier and SKU after scope review. For a stock offer, confirm the available quantity and its validity. For a custom kit, ask whether sample approval or packaging artwork starts the lead-time clock.

Can one request include several suppliers?

Yes. Compare offers per line and identify the consolidation owner. A single source simplifies release tracking. A split award broadens coverage and adds packaging and document checks at handoff.

Turn your part list into a sourcing brief

Share the OE references, expected volume and destination. Call out any specification that still needs confirmation.